Every room, one pass, one schedule — the whole drawing set under one signature, sequenced so the house never stops being a home.
A whole-home is where averages matter: ours land within ±2.4% of the signed estimate because the estimate was built from 214 delivered files, not a spreadsheet of hopes.
WHAT THE SHEET COVERS
THE FULL SETEVERY ROOM DRAWN + PRICED
SEQUENCINGLIVE-IN HALVES OR FULL DECANT
STRUCTUREOPENINGS, BEAMS, LOAD PATHS
SERVICESFULL REWIRE + REPIPE AS STANDARD
FINISHONE PUNCH LIST, ONE SIGN-OFF
FROM THE SET — FILES IN THIS SCOPE
ASKED ON EVERY Whole-Home Renovation JOB
For 20+ week projects, usually — we price both sequences so you can decide with numbers instead of dread.
Weekly cost reporting against the signed estimate, and change orders that are signed before they are built.
It gets photographed, priced, and decided together — same week, every time.
