SHEET 043-A · THE BUILD STORY
Ninety square feet, six weeks, zero shortcuts. A wet-room conversion in a 1912 house means the floor is never level and the stack is never where the last remodeler said it was. We laser-scanned the floor, sistered the joists, and set the linear drain to a fall you can check with a marble.
SPECIFICATIONS
SCOPEWET-ROOM CONVERSION
STRUCTUREJOISTS SISTERED
SERVICESSTACK RELOCATED
FINISHBESPOKE TILE
CREW LEADR. TAN
SCHEDULE — AS BUILTWK 01 → WK 06
6 WEEKS, ONE CREW, A ONE-PAGE UPDATE EVERY FRIDAY
SIGNED ESTIMATE
$58,000
FINAL INVOICE
$57,100
−1.6% VS ESTIMATE
“Six weeks to the day. The drain falls exactly where they drew it — I checked with a marble, like they told me to.”
— J. OKONKWO, IRVINGTON