The Kiln ADU
PROJECT FILE 0392025

The Kiln ADU

MILWAUKIE· ADU· 480 SQ FT· WK 22
Finished state
PRESS & HOLD — SEE IT MID-BUILD
SHEET 039-A · THE BUILD STORY

A backyard studio for a potter — hence the name, hence the 200-amp subpanel. ADUs live and die on the utility trench and the setback survey; we did both before design so the drawing never had to lie. The +2.4% is the kiln circuit the client added in week nine, priced and signed the same Friday it was asked for.

SPECIFICATIONS
SCOPEDETACHED ADU, GROUND-UP
STRUCTURESLAB + STUD FRAME
SERVICES200A SUBPANEL, KILN CIRCUIT
FINISHSTANDARD+
CREW LEADR. TAN
SCHEDULE — AS BUILTWK 01 → WK 22
22 WEEKS, ONE CREW, A ONE-PAGE UPDATE EVERY FRIDAY
SIGNED ESTIMATE
$228,000
FINAL INVOICE
$233,500
+2.4% VS ESTIMATE

The change order for the kiln circuit took one phone call and one signature. That is not what my neighbors told me to expect.

E. MARSH, MILWAUKIE
NEXT PROJECT FILE ▸
THE ALAMEDA KITCHEN