01  FINISH BOARD — 12.5 SKIM, TAPED & FILLED
02  ROUTED SERVICES — MAPPED & CERTIFIED
03  NEW STRUCTURE — LVL + STUD, PLUMB TO 1 MM
04  EXISTING FABRIC — 1911 BRICK, RETAINED
Existing room before renovation
Finished renovation
●  EXISTING — AS FOUND
SCROLL TO CUT THE SECTION▼
●  PORTLAND, OR — RENOVATIONS, REMODELS & ADDITIONSSECTION A–A′

BUILT TO
THE LINE.

A design-led renovation contractor. We open the wall, we know every layer, and the finished room matches the drawing. To the millimetre.

CCB #214930 · LICENSED, BONDED & INSURED · EST. 2009
AS BUILT — HANDED OVER

SHEET A-001 · THE PREMISE

MEASURED TWICE. BUILT ONCE.

Most renovations drift from the drawing — scope creeps, budgets slide, finishes get substituted on the way to the finish line. Redline works the other way around. The drawing is the contract, the schedule and the standard, and the finished room has to match it. That is the whole business.

YEARS ON THE TOOLS17EST. 2009 — SAME OWNER, SAME CREW LEADS
PROJECTS DELIVERED214KITCHENS TO WHOLE HOMES, ALL ON RECORD
AVG. COST VARIANCE±2.4%FINAL INVOICE VS. SIGNED ESTIMATE, ALL 214
CCB #214930LICENSED · BONDED · INSUREDTALLIED AT THE SITE OFFICE — AUDITED YEARLY
Finished kitchen, project file 041
PRESS & HOLD — SEE THE BONES
PROJECT FILE 041ALAMEDA, PORTLAND
THE ALAMEDA KITCHEN
14 WK · $118K · FINAL VARIANCE ±1.8%
OPEN THE SET →
SHEET A-500 · ONE PROJECT, START TO FINISHTHE WHITSHED ADDITION
WK 01
PERMIT SET — WK 01DRAWINGS STAMPED — SITE STAKED
SLAB POURED — WK 0428-DAY MIX, PINNED TO EXISTING
FRAME UP — WK 09LVL + STUD, PLUMB TO 1 MM
DRIED IN — WK 16OPENED TO THE HOUSE, ROUGH-IN DONE
HANDOVER — WK 26PUNCH LIST CLOSED — KEYS BACK
SHEET A-400 · ORDER OF OPERATIONS

HOW A PROJECT RUNS.

01CONSULT

Site visit, laser measure, straight answers on feasibility — before any money moves.

60–90 MIN · FREE INSIDE THE SERVICE AREA
02DESIGN

Drawings you own, priced line by line. Nothing is signed until the number is real.

2–4 WK · FIXED FEE, CREDITED AT BUILD
03PERMIT

We pull them, we chase them. Your file never sits in a queue unwatched.

CITY OF PORTLAND · BDS TRACKED WEEKLY
04BUILD

One crew, one lead, a one-page update every Friday. The drawing runs the site.

WK-BY-WK SCHEDULE · ±2.4% AVG VARIANCE
05HANDOVER

The punch list dies here — every item signed off against the drawing before keys.

2-YR WORKMANSHIP WARRANTY, IN WRITING
SHEET A-600 · SIGN-OFFS

THE HOMEOWNERS' RECORD.

R-01PROJECT FILE 036

“They found the rot behind the shower before it found our budget. The final invoice came in $4,600 under the signed estimate — I still have both pinned to the fridge.”

— DANA & MARCUS T., SELLWOOD
WHOLE-HOME · 2025 · 31 WKFLIP FOR THE FILE ⟲
R-01 — SITE RECORD
SCOPEWHOLE-HOME, 2,860 SQ FT
SCHEDULE31 WK, AS DRAWN
ESTIMATE$412,000
FINAL$407,400 (−1.1%)
CREW LEADM. OKAFOR
OPEN THE SET →
R-02PROJECT FILE 038

“Every Friday, a one-page update: what happened, what's next, what it costs. Twenty-six Fridays, zero surprises.”

— PRIYA N., GRANT PARK
ADDITION · 2025 · 26 WKFLIP FOR THE FILE ⟲
R-02 — SITE RECORD
SCOPEREAR ADDITION, 640 SQ FT
SCHEDULE26 WK, ON THE DAY
ESTIMATE$286,000
FINAL$291,700 (+2.0%)
CREW LEADS. VOSS
OPEN THE SET →
R-03PROJECT FILE 043

“Six weeks to the day. The drain falls exactly where they drew it — I checked with a marble, like they told me to.”

— J. OKONKWO, IRVINGTON
BATH · 2026 · 6 WKFLIP FOR THE FILE ⟲
R-03 — SITE RECORD
SCOPEWET-ROOM CONVERSION, 90 SQ FT
SCHEDULE6 WK, TO THE DAY
ESTIMATE$58,000
FINAL$57,100 (−1.6%)
CREW LEADR. ASANTE
OPEN THE SET →
ANYONE CANQUOTE A NUMBER.WE SIGN OURS.
EVERY ESTIMATE CARRIES THE SAME SIGNATURE AS THE FINAL INVOICE — A-700, NEXT SHEET DOWN.
SHEET A-700 · THE ESTIMATE MACHINE

KNOW YOUR NUMBER BEFORE YOU COMMIT.

Pick the project. The machine holds 214 delivered jobs' worth of real cost data — and it will not flatter you. The full three-step estimate takes about four minutes.

EST-PREVIEW · REV NLIVE RATES 2026
$48,000 — $140,0008–16 WK
TYPICAL DELIVERED RANGE · PORTLAND METRO · SIGNED-INVOICE DATA
BUILD YOUR ESTIMATE →
SHEET A-800 · SERVICE AREA

WHERE WE POUR.

Twenty-five minutes from the site office, door to door. Close enough that the project lead can be on your slab before the coffee is.

ALAMEDA
IRVINGTON
LAURELHURST
SELLWOOD
MILWAUKIE
LAKE OSWEGO
BEAVERTON
HAPPY VALLEY
ALAMEDA
IRVINGTON
LAURELHURST
SELLWOOD
MILWAUKIE
LAKE OSWEGO
BEAVERTON
HAPPY VALLEY
SITE OFFICE — SE GRAND
25-MIN RADIUS · NTS

LET'S DRAW THE LINE
ON YOUR PROJECT.

A measured estimate in four minutes, a site visit inside a week, and a number that still means something at handover.

PROJECT INQUIRY
The next project on the board could be yours.
GET AN ESTIMATE →
© 2026 REDLINE BUILD CO. · CCB #214930 · PORTLAND, ORDRAWN & CHECKED — SCALE 1:1, ALWAYS

Create a free website with Framer, the website builder loved by startups, designers and agencies.